Wear Point
Wear Point is an operational 8.2 MW onshore wind farm in Pembrokeshire, generating since 7 July 2014. Planning permission was granted on 25 May 2010, 8 months after submission. Operator of record: John Laing Environmental Assets Group.
Planning and build timeline
| Application submitted | 2 October 2009 |
| Permission granted | 25 May 2010 8 months after submission |
| Operational | 7 July 2014 49 months after consent |
Screening a site of your own?
Pembrokeshire approves 47% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Wear Point’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on onshore wind
Pembrokeshire has decided 15 onshore wind schemes and approved 47%, taking a median of 8 months. See every onshore wind scheme decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 9.9 | 0.5 km |
Wind Onshore · Under Construction | 14.4 | 1.2 km |
Wind Onshore · Operational | 3.2 | 2.3 km |
Solar Photovoltaics · Operational | 5 | 3.7 km |
Solar Photovoltaics · Operational | 10 | 3.8 km |
Solar Photovoltaics · Operational | 5.3 | 4.1 km |
Wind Onshore · Operational | 1 | 5.2 km |
Solar Photovoltaics · Operational | 24 | 6.1 km |
How big is Wear Point?
Wear Point has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wear Point?
REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wear Point approved and built?
The application was submitted on 2 October 2009. Permission was granted on 25 May 2010, 8 months later. The site became operational on 7 July 2014, 49 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4661.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode