Novarly ParcelRenewable sites

Renewable sitesWear Point

Wear Point

Wear Point is operational in Pembrokeshire with a recorded capacity of 8.2 MW, and has been generating since 2014-07-07.

8.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-07
Wind Onshore
Technology
John Laing Environmental Assets Group
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2009-10-02
Permission granted2010-05-25
8 months after submission
Operational2014-07-07
49 months after consent

Pembrokeshire’s record on onshore wind

Pembrokeshire has decided 15 onshore wind schemes and approved 47%, taking a median of 8 months. See every onshore wind scheme decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Dragon Long Meadow - Solar farm
Solar Photovoltaics · Operational
9.90.5 km
Dragon Energy Park - Wind Farm
Wind Onshore · Under Construction
14.41.2 km
Castle Pill - Repowering
Wind Onshore · Operational
3.22.3 km
Liddeston Ridge Solar Park (Milford Haven)
Solar Photovoltaics · Operational
53.7 km
Hoplass Farm
Solar Photovoltaics · Operational
103.8 km
Wogaston Solar Farm
Solar Photovoltaics · Operational
5.34.1 km
Lodge Farm 1
Wind Onshore · Operational
15.2 km
Tiers Cross Solar Farm
Solar Photovoltaics · Operational
246.1 km

How big is Wear Point?

Wear Point has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wear Point?

REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wear Point approved and built?

The application was submitted on 2009-10-02. Permission was granted on 2010-05-25, 8 months later. The site became operational on 2014-07-07, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4661.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council