Liddeston Ridge Solar Park (Milford Haven)
Liddeston Ridge Solar Park (Milford Haven) is operational in Pembrokeshire with a recorded capacity of 5 MW, and has been generating since 2014-03-31.
Planning and build timeline
| Application submitted | 2012-10-02 |
| Permission granted | 2013-01-24 4 months after submission |
| Operational | 2014-03-31 14 months after consent |
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lodge Farm 1 Wind Onshore · Operational | 1 | 1.5 km |
Castle Pill - Repowering Wind Onshore · Operational | 3.2 | 2.2 km |
Dragon Long Meadow - Solar farm Solar Photovoltaics · Operational | 9.9 | 3.3 km |
Tiers Cross Solar Farm Solar Photovoltaics · Operational | 24 | 3.4 km |
Wear Point Wind Onshore · Operational | 8.2 | 3.7 km |
Dragon Energy Park - Wind Farm Wind Onshore · Under Construction | 14.4 | 3.9 km |
Bolton Hill WTW Solar Photovoltaics · Operational | 0.5 | 5 km |
Wogaston Solar Farm Solar Photovoltaics · Operational | 5.3 | 5.8 km |
How big is Liddeston Ridge Solar Park (Milford Haven)?
Liddeston Ridge Solar Park (Milford Haven) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Liddeston Ridge Solar Park (Milford Haven)?
REPD records the operator as Milford Haven Port Authority. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Liddeston Ridge Solar Park (Milford Haven) approved and built?
The application was submitted on 2012-10-02. Permission was granted on 2013-01-24, 4 months later. The site became operational on 2014-03-31, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1634.