Renewable sites › Tiers Cross Solar Farm
Tiers Cross Solar Farm
Tiers Cross Solar Farm is an operational 24 MW solar farm in Pembrokeshire, generating since 25 October 2014. Planning permission was granted on 14 October 2013, 5 months after submission. Operator of record: Good Energy Generation.
Planning and build timeline
| Application submitted | 24 May 2013 |
| Permission granted | 14 October 2013 5 months after submission |
| Operational | 25 October 2014 12 months after consent |
Screening a site of your own?
Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tiers Cross Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.5 | 2 km |
Wind Onshore · Operational | 1 | 2.9 km |
Solar Photovoltaics · Operational | 5 | 3.4 km |
Wind Onshore · Operational | 3.2 | 3.8 km |
Wind Onshore · Operational | 1.6 | 3.9 km |
Solar Photovoltaics · Operational | 5 | 4.6 km |
Solar Photovoltaics · Operational | 5 | 4.8 km |
Wind Onshore · Under Construction | 14.4 | 5.5 km |
How big is Tiers Cross Solar Farm?
Tiers Cross Solar Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tiers Cross Solar Farm?
REPD records the operator as Good Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tiers Cross Solar Farm approved and built?
The application was submitted on 24 May 2013. Permission was granted on 14 October 2013, 5 months later. The site became operational on 25 October 2014, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2074.