Hoplass Farm

Hoplass Farm is operational in Pembrokeshire with a recorded capacity of 10 MW, and has been generating since 2015-03-13.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-13
Solar Photovoltaics
Technology
Kronos Solar
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2013-02-06
Permission granted2014-04-16
14 months after submission
Operational2015-03-13
11 months after consent

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Wogaston Solar Farm
Solar Photovoltaics · Operational
5.30.6 km
Wear Point
Wind Onshore · Operational
8.23.8 km
Dragon Long Meadow - Solar farm
Solar Photovoltaics · Operational
9.93.8 km
Dragon Energy Park - Wind Farm
Wind Onshore · Under Construction
14.45 km
Chapel Hill
Solar Photovoltaics · Operational
85.4 km
Castle Pill - Repowering
Wind Onshore · Operational
3.25.6 km
Liddeston Ridge Solar Park (Milford Haven)
Solar Photovoltaics · Operational
55.8 km
Lodge Farm 1
Wind Onshore · Operational
17.1 km

How big is Hoplass Farm?

Hoplass Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hoplass Farm?

REPD records the operator as Kronos Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hoplass Farm approved and built?

The application was submitted on 2013-02-06. Permission was granted on 2014-04-16, 14 months later. The site became operational on 2015-03-13, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5257.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council