Dragon Long Meadow - Solar farm

Dragon Long Meadow - Solar farm is an operational 9.9 MW solar farm in Pembrokeshire, generating since 13 March 2023. Planning permission was granted on 14 January 2022, 1 months after submission. Operator of record: Dragon LNG Limited / Anesco Limited.

9.9 MW
Capacity
as recorded in REPD
Operational
Status
since 13 March 2023
Solar Photovoltaics
Technology
Dragon LNG Limited / Anesco Limited
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted22 December 2021
Permission granted14 January 2022
1 months after submission
Operational13 March 2023
14 months after consent

Screening a site of your own?

RedlineUK · £39

Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dragon Long Meadow - Solar farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
8.20.5 km
Wind Onshore · Under Construction
14.41.4 km
Wind Onshore · Operational
3.22 km
Solar Photovoltaics · Operational
53.3 km
Solar Photovoltaics · Operational
103.8 km
Solar Photovoltaics · Operational
5.34.1 km
Wind Onshore · Operational
14.7 km
Solar Photovoltaics · Operational
245.7 km

How big is Dragon Long Meadow - Solar farm?

Dragon Long Meadow - Solar farm has a recorded installed capacity of 9.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dragon Long Meadow - Solar farm?

REPD records the operator as Dragon LNG Limited / Anesco Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dragon Long Meadow - Solar farm approved and built?

The application was submitted on 22 December 2021. Permission was granted on 14 January 2022, 1 months later. The site became operational on 13 March 2023, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10415.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode