Renewable sites › Lodge Farm 1
Lodge Farm 1
Lodge Farm 1 is an operational 1 MW onshore wind farm in Pembrokeshire, generating since 1 August 2006. Planning permission was granted on 1 October 2005, 9 months after submission. Operator of record: Private Developer.
Planning and build timeline
| Application submitted | 7 January 2005 |
| Permission granted | 1 October 2005 9 months after submission |
| Operational | 1 August 2006 10 months after consent |
Screening a site of your own?
Pembrokeshire approves 47% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lodge Farm 1’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on onshore wind
Pembrokeshire has decided 15 onshore wind schemes and approved 47%, taking a median of 8 months. See every onshore wind scheme decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 1.5 km |
Solar Photovoltaics · Operational | 24 | 2.9 km |
Wind Onshore · Operational | 3.2 | 3.4 km |
Solar Photovoltaics · Operational | 9.9 | 4.7 km |
Solar Photovoltaics · Operational | 0.5 | 4.8 km |
Wind Onshore · Operational | 8.2 | 5.2 km |
Wind Onshore · Under Construction | 14.4 | 5.3 km |
Wind Onshore · Operational | 1.6 | 6.8 km |
How big is Lodge Farm 1?
Lodge Farm 1 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lodge Farm 1?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lodge Farm 1 approved and built?
The application was submitted on 7 January 2005. Permission was granted on 1 October 2005, 9 months later. The site became operational on 1 August 2006, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3272.
Novarly Parcel · official public data, read properly · parcel.novarly.com