Lodge Farm 1 is operational in Pembrokeshire with a recorded capacity of 1 MW, and has been generating since 2006-08-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-08-01
Wind Onshore
Technology
Private Developer
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2005-01-07
Permission granted2005-10-01
9 months after submission
Operational2006-08-01
10 months after consent

Pembrokeshire’s record on onshore wind

Pembrokeshire has decided 15 onshore wind schemes and approved 47%, taking a median of 8 months. See every onshore wind scheme decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Liddeston Ridge Solar Park (Milford Haven)
Solar Photovoltaics · Operational
51.5 km
Tiers Cross Solar Farm
Solar Photovoltaics · Operational
242.9 km
Castle Pill - Repowering
Wind Onshore · Operational
3.23.4 km
Dragon Long Meadow - Solar farm
Solar Photovoltaics · Operational
9.94.7 km
Bolton Hill WTW
Solar Photovoltaics · Operational
0.54.8 km
Wear Point
Wind Onshore · Operational
8.25.2 km
Dragon Energy Park - Wind Farm
Wind Onshore · Under Construction
14.45.3 km
Lawrence Landfill
Wind Onshore · Operational
1.66.8 km

How big is Lodge Farm 1?

Lodge Farm 1 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lodge Farm 1?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lodge Farm 1 approved and built?

The application was submitted on 2005-01-07. Permission was granted on 2005-10-01, 9 months later. The site became operational on 2006-08-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3272.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council