Thrybergh Hydroelectric Scheme
Thrybergh Hydroelectric Scheme is an operational 0.3 MW battery storage site in Rotherham, generating since 1 October 2015. REPD does not record the planning grant date. Operator of record: Barn Energy.
Planning and build timeline
| Application submitted | 3 November 2016 |
| Permission granted | not recorded |
| Operational | 1 October 2015 |
Screening a site of your own?
Rotherham approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Thrybergh Hydroelectric Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Rotherham
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rotherham’s record on battery storage
Rotherham has decided 14 battery storage schemes and approved 100%, taking a median of 3.2 months. See every battery storage scheme decision in Rotherham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 4 | 5.1 km |
Biomass (dedicated) · Operational | 42 | 6.5 km |
Battery · Operational | 49.9 | 7.2 km |
Solar Photovoltaics · Operational | 1.5 | 7.5 km |
Biomass (dedicated) · Operational | 30 | 7.9 km |
Battery · Operational | 10 | 7.9 km |
Landfill Gas · Operational | 1.1 | 8 km |
Wind Onshore · Operational | 19.8 | 8.8 km |
How big is Thrybergh Hydroelectric Scheme?
Thrybergh Hydroelectric Scheme has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thrybergh Hydroelectric Scheme?
REPD records the operator as Barn Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thrybergh Hydroelectric Scheme approved and built?
The application was submitted on 3 November 2016. REPD does not record a grant date. The site became operational on 1 October 2015.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6969.