Thrybergh Hydroelectric Scheme

Thrybergh Hydroelectric Scheme is an operational 0.3 MW battery storage site in Rotherham, generating since 1 October 2015. REPD does not record the planning grant date. Operator of record: Barn Energy.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2015
Battery
Technology
Barn Energy
Rotherham
Authority
England

Planning and build timeline

Application submitted3 November 2016
Permission grantednot recorded
Operational1 October 2015

Screening a site of your own?

RedlineUK · £39

Rotherham approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Thrybergh Hydroelectric Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rotherham’s record on battery storage

Rotherham has decided 14 battery storage schemes and approved 100%, taking a median of 3.2 months. See every battery storage scheme decision in Rotherham

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
45.1 km
Biomass (dedicated) · Operational
426.5 km
Battery · Operational
49.97.2 km
Solar Photovoltaics · Operational
1.57.5 km
Biomass (dedicated) · Operational
307.9 km
Battery · Operational
107.9 km
Landfill Gas · Operational
1.18 km
Wind Onshore · Operational
19.88.8 km

How big is Thrybergh Hydroelectric Scheme?

Thrybergh Hydroelectric Scheme has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thrybergh Hydroelectric Scheme?

REPD records the operator as Barn Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thrybergh Hydroelectric Scheme approved and built?

The application was submitted on 3 November 2016. REPD does not record a grant date. The site became operational on 1 October 2015.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6969.