Renewable sitesTempleborough Biomass Power Plant- Rotherham

Templeborough Biomass Power Plant- Rotherham

Templeborough Biomass Power Plant- Rotherham is operational in Rotherham with a recorded capacity of 42 MW, and has been generating since 2019-02-28.

42 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-02-28
Biomass (dedicated)
Technology
Greencoat Capital
Rotherham
Authority
England

Planning and build timeline

Application submitted2010-06-07
Permission granted2010-11-09
5 months after submission
Operational2019-02-28
100 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Blackburn Meadows Biomass Plant
Biomass (dedicated) · Operational
301.7 km
Blackburn Meadows
Battery · Operational
101.7 km
Meadow Hall Power
Landfill Gas · Operational
1.12.3 km
Advanced Manufacturing Research Centre
Wind Onshore · Operational
2.63.9 km
Loicher Lane
Biomass (dedicated) · Operational
85.8 km
Sheffield ERF
EfW Incineration · Operational
19.36.4 km
Thrybergh Hydroelectric Scheme
Battery · Operational
0.36.5 km
Penny Hill Lane
Wind Onshore · Operational
19.86.7 km

How big is Templeborough Biomass Power Plant- Rotherham?

Templeborough Biomass Power Plant- Rotherham has a recorded installed capacity of 42 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Templeborough Biomass Power Plant- Rotherham?

REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Templeborough Biomass Power Plant- Rotherham approved and built?

The application was submitted on 2010-06-07. Permission was granted on 2010-11-09, 5 months later. The site became operational on 2019-02-28, 100 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 161.