Renewable sitesPenny Hill Lane

Penny Hill Lane

Penny Hill Lane is an operational 19.8 MW onshore wind farm in Rotherham, generating since 31 March 2013. Planning permission was granted on 27 May 2010, 10 months after submission. Operator of record: Banks Renewables.

19.8 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2013
Wind Onshore
Technology
Banks Renewables
Rotherham
Authority
England

Planning and build timeline

Application submitted22 July 2009
Permission granted27 May 2010
10 months after submission
Operational31 March 2013
34 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Rotherham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Penny Hill Lane’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.92.8 km
Wind Onshore · Operational
2.65.4 km
Biomass (dedicated) · Operational
6.56.3 km
Biomass (dedicated) · Operational
426.7 km
Biomass (dedicated) · Operational
307.9 km
Battery · Operational
107.9 km
Landfill Gas · Operational
1.18.7 km
Wind Onshore · Operational
4.58.7 km

How big is Penny Hill Lane?

Penny Hill Lane has a recorded installed capacity of 19.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Penny Hill Lane?

REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Penny Hill Lane approved and built?

The application was submitted on 22 July 2009. Permission was granted on 27 May 2010, 10 months later. The site became operational on 31 March 2013, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3677.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode