Blackburn Meadows Biomass Plant

Blackburn Meadows Biomass Plant is operational in Sheffield with a recorded capacity of 30 MW, and has been generating since 2014-07-07.

30 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-07
Biomass (dedicated)
Technology
E.ON UK
Sheffield
Authority
England

Planning and build timeline

Application submitted2008-03-01
Permission granted2008-07-15
4 months after submission
Operational2014-07-07
72 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Blackburn Meadows
Battery · Operational
100 km
Meadow Hall Power
Landfill Gas · Operational
1.10.9 km
Templeborough Biomass Power Plant- Rotherham
Biomass (dedicated) · Operational
421.7 km
Advanced Manufacturing Research Centre
Wind Onshore · Operational
2.63.9 km
Loicher Lane
Biomass (dedicated) · Operational
84.5 km
Sheffield ERF
EfW Incineration · Operational
19.35 km
Parkwood Landfill Scheme
Landfill Gas · Operational
1.25.7 km
Penny Hill Lane
Wind Onshore · Operational
19.87.9 km

How big is Blackburn Meadows Biomass Plant?

Blackburn Meadows Biomass Plant has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blackburn Meadows Biomass Plant?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blackburn Meadows Biomass Plant approved and built?

The application was submitted on 2008-03-01. Permission was granted on 2008-07-15, 4 months later. The site became operational on 2014-07-07, 72 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 166.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council