Meadow Hall Power
Meadow Hall Power is operational in Rotherham with a recorded capacity of 1.1 MW, and has been generating since 2007-07-01.
Planning and build timeline
| Application submitted | 1994-03-07 |
| Permission granted | 1994-08-11 5 months after submission |
| Operational | 2007-07-01 155 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — Rotherham
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blackburn Meadows Biomass Plant Biomass (dedicated) · Operational | 30 | 0.9 km |
Blackburn Meadows Battery · Operational | 10 | 0.9 km |
Templeborough Biomass Power Plant- Rotherham Biomass (dedicated) · Operational | 42 | 2.3 km |
Loicher Lane Biomass (dedicated) · Operational | 8 | 3.6 km |
Advanced Manufacturing Research Centre Wind Onshore · Operational | 2.6 | 4.7 km |
Sheffield ERF EfW Incineration · Operational | 19.3 | 5.2 km |
Parkwood Landfill Scheme Landfill Gas · Operational | 1.2 | 5.4 km |
Thrybergh Hydroelectric Scheme Battery · Operational | 0.3 | 8 km |
How big is Meadow Hall Power?
Meadow Hall Power has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Meadow Hall Power?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Meadow Hall Power approved and built?
The application was submitted on 1994-03-07. Permission was granted on 1994-08-11, 5 months later. The site became operational on 2007-07-01, 155 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 772.