Renewable sites › Goldthorpe
Goldthorpe
Goldthorpe is operational in Barnsley with a recorded capacity of 1.5 MW, and has been generating since 2014-05-21.
Planning and build timeline
| Application submitted | 2013-05-14 |
| Permission granted | 2013-07-02 2 months after submission |
| Operational | 2014-05-21 11 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Barnsley’s record on solar
Barnsley has decided 13 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Barnsley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) Anaerobic Digestion · Operational | 4 | 2.4 km |
Marr Windfarm Wind Onshore · Operational | 8 | 5.1 km |
Hampole Wind Farm Wind Onshore · Operational | 8 | 6.6 km |
Thrybergh Hydroelectric Scheme Battery · Operational | 0.3 | 7.5 km |
Park Spring Wind Farm Wind Onshore · Operational | 8.6 | 7.5 km |
Tesco Wombwell Lane Solar Photovoltaics · Operational | 0.2 | 7.8 km |
South Kirkby Business Park (Waste AD) Anaerobic Digestion · Operational | 6 | 8.3 km |
Elmsall Way, South Elmsall - Solar Panels Solar Photovoltaics · Under Construction | 3 | 8.6 km |
How big is Goldthorpe?
Goldthorpe has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Goldthorpe?
REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Goldthorpe approved and built?
The application was submitted on 2013-05-14. Permission was granted on 2013-07-02, 2 months later. The site became operational on 2014-05-21, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1473.