Blackburn Meadows is operational in Sheffield with a recorded capacity of 10 MW, and has been generating since 2017-10-09.
Planning and build timeline
| Application submitted | 2011-08-19 |
| Permission granted | not recorded |
| Operational | 2017-10-09 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Sheffield’s record on battery storage
Sheffield has decided 7 battery storage schemes and approved 100%, taking a median of 5.9 months. See every battery storage scheme decision in Sheffield →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blackburn Meadows Biomass Plant Biomass (dedicated) · Operational | 30 | 0 km |
Meadow Hall Power Landfill Gas · Operational | 1.1 | 0.9 km |
Templeborough Biomass Power Plant- Rotherham Biomass (dedicated) · Operational | 42 | 1.7 km |
Advanced Manufacturing Research Centre Wind Onshore · Operational | 2.6 | 3.9 km |
Loicher Lane Biomass (dedicated) · Operational | 8 | 4.5 km |
Sheffield ERF EfW Incineration · Operational | 19.3 | 5 km |
Parkwood Landfill Scheme Landfill Gas · Operational | 1.2 | 5.7 km |
Penny Hill Lane Wind Onshore · Operational | 19.8 | 7.9 km |
How big is Blackburn Meadows?
Blackburn Meadows has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blackburn Meadows?
REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blackburn Meadows approved and built?
The application was submitted on 2011-08-19. REPD does not record a grant date. The site became operational on 2017-10-09.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6906.