Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) is operational in Rotherham with a recorded capacity of 4 MW, and has been generating since 2015-07-13.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-13
Anaerobic Digestion
Technology
Shanks Group
Rotherham
Authority
England

Planning and build timeline

Application submitted2011-10-25
Permission granted2012-05-08
6 months after submission
Operational2015-07-13
38 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Goldthorpe
Solar Photovoltaics · Operational
1.52.4 km
Thrybergh Hydroelectric Scheme
Battery · Operational
0.35.1 km
Marr Windfarm
Wind Onshore · Operational
85.8 km
Tesco Wombwell Lane
Solar Photovoltaics · Operational
0.28.5 km
Hampole Wind Farm
Wind Onshore · Operational
88.6 km
Park Spring Wind Farm
Wind Onshore · Operational
8.69.3 km
Barnsley Battery Energy Storage
Battery · Operational
409.9 km
Stairfoot Battery Storage Facility
Battery · Operational
10 km

How big is Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)?

Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)?

REPD records the operator as Shanks Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) approved and built?

The application was submitted on 2011-10-25. Permission was granted on 2012-05-08, 6 months later. The site became operational on 2015-07-13, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 339.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council