Renewable sitesBolton Road Waste Treatment and Renewable Energy Facility (Waste AD)

Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)

Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) is an operational 4 MW anaerobic digestion plant in Rotherham, generating since 13 July 2015. Planning permission was granted on 8 May 2012, 6 months after submission. Operator of record: Shanks Group.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 13 July 2015
Anaerobic Digestion
Technology
Shanks Group
Rotherham
Authority
England

Planning and build timeline

Application submitted25 October 2011
Permission granted8 May 2012
6 months after submission
Operational13 July 2015
38 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Rotherham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.52.4 km
Battery · Operational
0.35.1 km
Wind Onshore · Operational
85.8 km
Solar Photovoltaics · Operational
0.28.5 km
Wind Onshore · Operational
88.6 km
Wind Onshore · Operational
8.69.3 km
Battery · Operational
409.9 km
Battery · Operational
10 km

How big is Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)?

Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD)?

REPD records the operator as Shanks Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) approved and built?

The application was submitted on 25 October 2011. Permission was granted on 8 May 2012, 6 months later. The site became operational on 13 July 2015, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 339.