Pelham

Pelham is operational in Uttlesford with a recorded capacity of 49 MW, and has been generating since 2017-06-15.

49 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-06-15
Battery
Technology
Statera Energy/ InfraRed Capital
Uttlesford
Authority
England

Planning and build timeline

Application submitted2016-08-16
Permission grantednot recorded
Operational2017-06-15

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on battery storage

Uttlesford has decided 8 battery storage schemes and approved 88%, taking a median of 8 months. See every battery storage scheme decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
Ugley
Landfill Gas · Operational
1.16.7 km
West Mill
Landfill Gas · Operational
2.510.3 km
The Nurseries, Green Tye
Anaerobic Digestion · Operational
1.210.4 km
Stanstead Solar Project
Solar Photovoltaics · Under Construction
14.311.5 km
Buttermilk Farm
Anaerobic Digestion · Operational
1.111.6 km
Mill Farm
Solar Photovoltaics · Operational
511.9 km
Wisbridge Farm
Solar Photovoltaics · Operational
9.312 km
Hatch Penn Farm PV
Solar Photovoltaics · Operational
113 km

How big is Pelham?

Pelham has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pelham?

REPD records the operator as Statera Energy/ InfraRed Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pelham approved and built?

The application was submitted on 2016-08-16. REPD does not record a grant date. The site became operational on 2017-06-15.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6898.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council