Renewable sites › Pelham
Pelham
Pelham is an operational 49 MW battery storage site in Uttlesford, generating since 15 June 2017. REPD does not record the planning grant date. Operator of record: Statera Energy/ InfraRed Capital.
Planning and build timeline
| Application submitted | 16 August 2016 |
| Permission granted | not recorded |
| Operational | 15 June 2017 |
Screening a site of your own?
Uttlesford approves 88% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pelham’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Uttlesford’s record on battery storage
Uttlesford has decided 8 battery storage schemes and approved 88%, taking a median of 8 months. See every battery storage scheme decision in Uttlesford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.1 | 6.7 km |
Landfill Gas · Operational | 2.5 | 10.3 km |
Anaerobic Digestion · Operational | 1.2 | 10.4 km |
Solar Photovoltaics · Under Construction | 14.3 | 11.5 km |
Anaerobic Digestion · Operational | 1.1 | 11.6 km |
Solar Photovoltaics · Operational | 5 | 11.9 km |
Solar Photovoltaics · Operational | 9.3 | 12 km |
Solar Photovoltaics · Operational | 1 | 13 km |
How big is Pelham?
Pelham has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pelham?
REPD records the operator as Statera Energy/ InfraRed Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pelham approved and built?
The application was submitted on 16 August 2016. REPD does not record a grant date. The site became operational on 15 June 2017.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6898.