Stanstead Solar Project is under construction in Uttlesford with a recorded capacity of 14.3 MW.

14.3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Manchester Airport Group Plc
Uttlesford
Authority
England

Planning and build timeline

Application submitted2022-06-01
Permission granted2022-08-24
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on solar

Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
West Mill
Landfill Gas · Operational
2.51.7 km
Ugley
Landfill Gas · Operational
1.16.1 km
Station Works AD
Anaerobic Digestion · Operational
18 km
Dunmow Solar Farm, Chelmsford Road - Solar Farm
Solar Photovoltaics · Under Construction
9.898.2 km
Tooleys Farm
Solar Photovoltaics · Operational
5.38.9 km
Terriers Farm
Solar Photovoltaics · Operational
4410.8 km
Spriggs Farm
Solar Photovoltaics · Operational
1211.3 km
Pelham
Battery · Operational
4911.5 km

How big is Stanstead Solar Project?

Stanstead Solar Project has a recorded installed capacity of 14.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stanstead Solar Project?

REPD records the operator as Manchester Airport Group Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stanstead Solar Project approved and built?

The application was submitted on 2022-06-01. Permission was granted on 2022-08-24, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9503.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council