Novarly ParcelRenewable sites

Renewable sitesWisbridge Farm

Wisbridge Farm

Wisbridge Farm is an operational 9.3 MW solar farm in North Hertfordshire, generating since 1 October 2014. Planning permission was granted on 27 March 2013, 5 months after submission. Operator of record: Push Energy.

9.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2014
Solar Photovoltaics
Technology
Push Energy
North Hertfordshire
Authority
England

Planning and build timeline

Application submitted23 October 2012
Permission granted27 March 2013
5 months after submission
Operational1 October 2014
18 months after consent

Screening a site of your own?

RedlineUK · £39

North Hertfordshire approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wisbridge Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Hertfordshire’s record on solar

North Hertfordshire has decided 8 solar farms and approved 88%, taking a median of 20.3 months. See every solar farm decision in North Hertfordshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
11.5 km
Solar Photovoltaics · Operational
56.4 km
Solar Photovoltaics · Operational
31.66.5 km
Solar Photovoltaics · Operational
14.47.2 km
Anaerobic Digestion · Operational
1.17.2 km
Solar Photovoltaics · Operational
248 km
Anaerobic Digestion · Operational
2.38.9 km
Solar Photovoltaics · Operational
31.88.9 km

How big is Wisbridge Farm?

Wisbridge Farm has a recorded installed capacity of 9.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wisbridge Farm?

REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wisbridge Farm approved and built?

The application was submitted on 23 October 2012. Permission was granted on 27 March 2013, 5 months later. The site became operational on 1 October 2014, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1940.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode