Wisbridge Farm

Wisbridge Farm is operational in North Hertfordshire with a recorded capacity of 9.3 MW, and has been generating since 2014-10-01.

9.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-10-01
Solar Photovoltaics
Technology
Push Energy
North Hertfordshire
Authority
England

Planning and build timeline

Application submitted2012-10-23
Permission granted2013-03-27
5 months after submission
Operational2014-10-01
18 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Hertfordshire’s record on solar

North Hertfordshire has decided 8 solar farms and approved 88%, taking a median of 20.3 months. See every solar farm decision in North Hertfordshire

Other built sites within 15 km

SiteMWDistance
Hatch Penn Farm PV
Solar Photovoltaics · Operational
11.5 km
Royston Solar Farm (Phase 1) (a)
Solar Photovoltaics · Operational
56.4 km
Munceys Farm
Solar Photovoltaics · Operational
31.66.5 km
Bassingbourn Solar Farm
Solar Photovoltaics · Operational
14.47.2 km
Buttermilk Farm
Anaerobic Digestion · Operational
1.17.2 km
Bury Lane Fruit Farm
Solar Photovoltaics · Operational
248 km
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD)
Anaerobic Digestion · Operational
2.38.9 km
Black Peak Farm
Solar Photovoltaics · Operational
31.88.9 km

How big is Wisbridge Farm?

Wisbridge Farm has a recorded installed capacity of 9.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wisbridge Farm?

REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wisbridge Farm approved and built?

The application was submitted on 2012-10-23. Permission was granted on 2013-03-27, 5 months later. The site became operational on 2014-10-01, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1940.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council