Renewable sites › The Nurseries, Green Tye
The Nurseries, Green Tye
The Nurseries, Green Tye is operational in East Hertfordshire with a recorded capacity of 1.2 MW, and has been generating since 2016-06-15.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-06-15 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Rye Meads Sewerage Treatment Works Anaerobic Digestion · Operational | 2.3 | 9.4 km |
Pelham Battery · Operational | 49 | 10.4 km |
Westmill Qaurry Landfill Gas · Operational | 2.6 | 10.6 km |
Brazier Landfill Scheme Landfill Gas · Operational | 3.9 | 10.7 km |
Ratty's Lane Sustainable Energy Facility (Waste AD) Anaerobic Digestion · Operational | 3 | 10.8 km |
Ratty's Lane Sustainable Energy Facility (ACT) Advanced Conversion Technologies · Under Construction | 9.6 | 10.8 km |
West Mill Landfill Gas · Operational | 2.5 | 11.1 km |
Mill Farm Solar Photovoltaics · Operational | 5 | 11.7 km |
How big is The Nurseries, Green Tye?
The Nurseries, Green Tye has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Nurseries, Green Tye?
REPD records the operator as Guy & Wright Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Nurseries, Green Tye approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-06-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6167.