Renewable sites › The Nurseries, Green Tye
The Nurseries, Green Tye
The Nurseries, Green Tye is an operational 1.2 MW anaerobic digestion plant in East Hertfordshire, generating since 15 June 2016. REPD does not record the planning grant date. Operator of record: Guy & Wright Ltd.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 15 June 2016 |
Screening a site of your own?
Redline runs the record on your own boundary in East Hertfordshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with The Nurseries, Green Tye’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 2.3 | 9.4 km |
Battery · Operational | 49 | 10.4 km |
Landfill Gas · Operational | 2.6 | 10.6 km |
Landfill Gas · Operational | 3.9 | 10.7 km |
Anaerobic Digestion · Operational | 3 | 10.8 km |
Advanced Conversion Technologies · Under Construction | 9.6 | 10.8 km |
Landfill Gas · Operational | 2.5 | 11.1 km |
Solar Photovoltaics · Operational | 5 | 11.7 km |
How big is The Nurseries, Green Tye?
The Nurseries, Green Tye has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Nurseries, Green Tye?
REPD records the operator as Guy & Wright Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Nurseries, Green Tye approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 15 June 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6167.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode