Novarly ParcelRenewable sites

Renewable sitesUgley

Ugley

Ugley is an operational 1.1 MW landfill gas site in Uttlesford, generating since 1 December 2005. Planning permission was granted on 1 July 2003, 6 months after submission. Operator of record: Biffa.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2005
Landfill Gas
Technology
Biffa
Uttlesford
Authority
England

Planning and build timeline

Application submitted7 January 2003
Permission granted1 July 2003
6 months after submission
Operational1 December 2005
29 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Uttlesford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ugley’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.55.9 km
Solar Photovoltaics · Under Construction
14.36.1 km
Battery · Operational
496.7 km
Anaerobic Digestion · Operational
17.8 km
Solar Photovoltaics · Operational
199.4 km
Solar Photovoltaics · Operational
4410.7 km
Solar Photovoltaics · Operational
1211.1 km
Solar Photovoltaics · Operational
10.812.3 km

How big is Ugley?

Ugley has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ugley?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ugley approved and built?

The application was submitted on 7 January 2003. Permission was granted on 1 July 2003, 6 months later. The site became operational on 1 December 2005, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 653.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode