Hatch Penn Farm PV

Hatch Penn Farm PV is operational in North Hertfordshire with a recorded capacity of 1 MW, and has been generating since 2014-03-08.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-08
Solar Photovoltaics
Technology
Private Developer
North Hertfordshire
Authority
England

Planning and build timeline

Application submitted2013-11-24
Permission granted2013-12-03
0 months after submission
Operational2014-03-08
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Hertfordshire’s record on solar

North Hertfordshire has decided 8 solar farms and approved 88%, taking a median of 20.3 months. See every solar farm decision in North Hertfordshire

Other built sites within 15 km

SiteMWDistance
Wisbridge Farm
Solar Photovoltaics · Operational
9.31.5 km
Royston Solar Farm (Phase 1) (a)
Solar Photovoltaics · Operational
54.9 km
Munceys Farm
Solar Photovoltaics · Operational
31.65.1 km
Bassingbourn Solar Farm
Solar Photovoltaics · Operational
14.45.8 km
Bury Lane Fruit Farm
Solar Photovoltaics · Operational
246.6 km
Black Peak Farm
Solar Photovoltaics · Operational
31.87.7 km
Buttermilk Farm
Anaerobic Digestion · Operational
1.18.6 km
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD)
Anaerobic Digestion · Operational
2.39.1 km

How big is Hatch Penn Farm PV?

Hatch Penn Farm PV has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hatch Penn Farm PV?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hatch Penn Farm PV approved and built?

The application was submitted on 2013-11-24. Permission was granted on 2013-12-03, 0 months later. The site became operational on 2014-03-08, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1994.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council