Buttermilk Farm is operational in East Hertfordshire with a recorded capacity of 1.1 MW, and has been generating since 2012-05-01.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-05-01
Anaerobic Digestion
Technology
Hallwick Energy
East Hertfordshire
Authority
England

Planning and build timeline

Application submitted2010-09-03
Permission granted2011-01-12
4 months after submission
Operational2012-05-01
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Mill Farm
Solar Photovoltaics · Operational
54.4 km
Wisbridge Farm
Solar Photovoltaics · Operational
9.37.2 km
Hatch Penn Farm PV
Solar Photovoltaics · Operational
18.6 km
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD)
Anaerobic Digestion · Operational
2.39 km
Pelham
Battery · Operational
4911.6 km
Flamingo House
Solar Photovoltaics · Operational
112.4 km
Royston Solar Farm (Phase 1) (a)
Solar Photovoltaics · Operational
513.3 km
Bassingbourn Solar Farm
Solar Photovoltaics · Operational
14.413.7 km

How big is Buttermilk Farm?

Buttermilk Farm has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Buttermilk Farm?

REPD records the operator as Hallwick Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Buttermilk Farm approved and built?

The application was submitted on 2010-09-03. Permission was granted on 2011-01-12, 4 months later. The site became operational on 2012-05-01, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 238.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council