Planning and build timeline
| Application submitted | 2010-09-03 |
| Permission granted | 2011-01-12 4 months after submission |
| Operational | 2012-05-01 16 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Mill Farm Solar Photovoltaics · Operational | 5 | 4.4 km |
Wisbridge Farm Solar Photovoltaics · Operational | 9.3 | 7.2 km |
Hatch Penn Farm PV Solar Photovoltaics · Operational | 1 | 8.6 km |
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD) Anaerobic Digestion · Operational | 2.3 | 9 km |
Pelham Battery · Operational | 49 | 11.6 km |
Flamingo House Solar Photovoltaics · Operational | 1 | 12.4 km |
Royston Solar Farm (Phase 1) (a) Solar Photovoltaics · Operational | 5 | 13.3 km |
Bassingbourn Solar Farm Solar Photovoltaics · Operational | 14.4 | 13.7 km |
How big is Buttermilk Farm?
Buttermilk Farm has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Buttermilk Farm?
REPD records the operator as Hallwick Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Buttermilk Farm approved and built?
The application was submitted on 2010-09-03. Permission was granted on 2011-01-12, 4 months later. The site became operational on 2012-05-01, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 238.