Nevendon Battery Storage Extension

Nevendon Battery Storage Extension is an operational 5 MW battery storage site in Basildon, generating since 23 October 2024. Planning permission was granted on 15 May 2023, 4 months after submission. Operator of record: Belectric Solar Limited.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 23 October 2024
Battery
Technology
Belectric Solar Limited
Basildon
Authority
England

Planning and build timeline

Application submitted26 January 2023
Permission granted15 May 2023
4 months after submission
Operational23 October 2024
17 months after consent

Screening a site of your own?

RedlineUK · £39

Basildon approves 83% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Nevendon Battery Storage Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basildon’s record on battery storage

Basildon has decided 6 battery storage schemes and approved 83%, taking a median of 7.9 months. See every battery storage scheme decision in Basildon

Other built sites within 15 km

SiteMWDistance
Battery · Operational
100 km
Solar Photovoltaics · Under Construction
25.62.6 km
Solar Photovoltaics · Operational
0.43.4 km
Solar Photovoltaics · Operational
54.6 km
Battery · Operational
99.984.8 km
Landfill Gas · Operational
146.3 km
Solar Photovoltaics · Operational
5.26.4 km
Landfill Gas · Operational
11.66.4 km

How big is Nevendon Battery Storage Extension?

Nevendon Battery Storage Extension has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nevendon Battery Storage Extension?

REPD records the operator as Belectric Solar Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nevendon Battery Storage Extension approved and built?

The application was submitted on 26 January 2023. Permission was granted on 15 May 2023, 4 months later. The site became operational on 23 October 2024, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13197.