Crays Hall Farm - Solar Arrays

Crays Hall Farm - Solar Arrays is under construction in Basildon with a recorded capacity of 25.6 MW.

25.6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Boom Power Limited
Basildon
Authority
England

Planning and build timeline

Application submitted2022-03-01
Permission granted2023-08-30
18 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basildon’s record on solar

Basildon has decided 12 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Basildon

Other built sites within 15 km

SiteMWDistance
Outwood Farm (Phase 1)
Solar Photovoltaics · Operational
52 km
Nevendon
Battery · Operational
102.6 km
Nevendon Battery Storage Extension
Battery · Operational
52.6 km
Ford Research And Engineering Centre, Dunton - Solar Farm
Solar Photovoltaics · Operational
5.25.3 km
Tesco Extra Hazelmere
Solar Photovoltaics · Operational
0.45.7 km
Crouch Solar Farm
Battery · Operational
49.96.7 km
Crouch Solar Farm
Solar Photovoltaics · Operational
49.96.7 km
Dollymans Storage
Battery · Operational
99.986.9 km

How big is Crays Hall Farm - Solar Arrays?

Crays Hall Farm - Solar Arrays has a recorded installed capacity of 25.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crays Hall Farm - Solar Arrays?

REPD records the operator as Boom Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crays Hall Farm - Solar Arrays approved and built?

The application was submitted on 2022-03-01. Permission was granted on 2023-08-30, 18 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10778.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council