Nevendon

Nevendon is an operational 10 MW battery storage site in Basildon, generating since 15 March 2018. REPD does not record the planning grant date. Operator of record: Belectric UK / Foresight.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2018
Battery
Technology
Belectric UK / Foresight
Basildon
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational15 March 2018

Screening a site of your own?

RedlineUK · £39

Basildon approves 83% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Nevendon’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basildon’s record on battery storage

Basildon has decided 6 battery storage schemes and approved 83%, taking a median of 7.9 months. See every battery storage scheme decision in Basildon

Other built sites within 15 km

SiteMWDistance
Battery · Operational
50 km
Solar Photovoltaics · Under Construction
25.62.6 km
Solar Photovoltaics · Operational
0.43.4 km
Solar Photovoltaics · Operational
54.6 km
Battery · Operational
99.984.8 km
Landfill Gas · Operational
146.3 km
Solar Photovoltaics · Operational
5.26.4 km
Landfill Gas · Operational
11.66.4 km

How big is Nevendon?

Nevendon has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nevendon?

REPD records the operator as Belectric UK / Foresight. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nevendon approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 15 March 2018.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6926.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode