Renewable sites › Pitsea Tipp
Pitsea Tipp
Pitsea Tipp is operational in Thurrock with a recorded capacity of 14 MW, and has been generating since 2008-05-13.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2008-05-13 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- SSSI — Holehaven Creek SSSI
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pitsea Landfill Scheme Landfill Gas · Operational | 11.6 | 0.1 km |
Tesco Extra Hazelmere Solar Photovoltaics · Operational | 0.4 | 2.9 km |
Nevendon Battery · Operational | 10 | 6.3 km |
Nevendon Battery Storage Extension Battery · Operational | 5 | 6.3 km |
Dollymans Storage Battery · Operational | 99.98 | 7.4 km |
Mucking Gas 2 Landfill Scheme Landfill Gas · Operational | 3.8 | 7.6 km |
Mucking Gas 3 Landfill Scheme Landfill Gas · Operational | 3.9 | 7.6 km |
Great Wheatley Road - Solar Farm Solar Photovoltaics · Under Construction | 30 | 7.9 km |
How big is Pitsea Tipp?
Pitsea Tipp has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pitsea Tipp?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pitsea Tipp approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2008-05-13.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 626.