Renewable sitesPitsea Tipp

Pitsea Tipp

Pitsea Tipp is operational in Thurrock with a recorded capacity of 14 MW, and has been generating since 2008-05-13.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-05-13
Landfill Gas
Technology
Unknown
Thurrock
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2008-05-13

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Pitsea Landfill Scheme
Landfill Gas · Operational
11.60.1 km
Tesco Extra Hazelmere
Solar Photovoltaics · Operational
0.42.9 km
Nevendon
Battery · Operational
106.3 km
Nevendon Battery Storage Extension
Battery · Operational
56.3 km
Dollymans Storage
Battery · Operational
99.987.4 km
Mucking Gas 2 Landfill Scheme
Landfill Gas · Operational
3.87.6 km
Mucking Gas 3 Landfill Scheme
Landfill Gas · Operational
3.97.6 km
Great Wheatley Road - Solar Farm
Solar Photovoltaics · Under Construction
307.9 km

How big is Pitsea Tipp?

Pitsea Tipp has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pitsea Tipp?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pitsea Tipp approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2008-05-13.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 626.