Novarly ParcelRenewable sites

Renewable sitesPitsea Tipp

Pitsea Tipp

Pitsea Tipp is an operational 14 MW landfill gas site in Thurrock, generating since 13 May 2008. REPD does not record the planning grant date. Operator of record: Unknown.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 13 May 2008
Landfill Gas
Technology
Unknown
Thurrock
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational13 May 2008

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Thurrock: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Pitsea Tipp’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
11.60.1 km
Solar Photovoltaics · Operational
0.42.9 km
Battery · Operational
56.3 km
Battery · Operational
106.3 km
Battery · Operational
99.987.4 km
Landfill Gas · Operational
3.97.6 km
Landfill Gas · Operational
3.87.6 km
Solar Photovoltaics · Under Construction
307.9 km

How big is Pitsea Tipp?

Pitsea Tipp has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pitsea Tipp?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pitsea Tipp approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 13 May 2008.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 626.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode