Ford Research And Engineering Centre, Dunton - Solar Farm is an operational 5.2 MW solar farm in Basildon, generating since 31 January 2025. Planning permission was granted on 28 February 2023, 9 months after submission. Operator of record: Ford Motor Company Limited.

5.2 MW
Capacity
as recorded in REPD
Operational
Status
since 31 January 2025
Solar Photovoltaics
Technology
Ford Motor Company Limited
Basildon
Authority
England

Planning and build timeline

Application submitted10 June 2022
Permission granted28 February 2023
9 months after submission
Operational31 January 2025
23 months after consent

Screening a site of your own?

RedlineUK · £39

Basildon approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ford Research And Engineering Centre, Dunton - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basildon’s record on solar

Basildon has decided 12 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Basildon

Other built sites within 15 km

SiteMWDistance
Battery · Operational
281.9 km
Solar Photovoltaics · Operational
102.2 km
Battery · Operational
49.92.2 km
Solar Photovoltaics · Operational
49.92.2 km
Solar Photovoltaics · Under Construction
25.65.3 km
Solar Photovoltaics · Operational
55.3 km
Battery · Operational
106.4 km
Battery · Operational
56.4 km

How big is Ford Research And Engineering Centre, Dunton - Solar Farm?

Ford Research And Engineering Centre, Dunton - Solar Farm has a recorded installed capacity of 5.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ford Research And Engineering Centre, Dunton - Solar Farm?

REPD records the operator as Ford Motor Company Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ford Research And Engineering Centre, Dunton - Solar Farm approved and built?

The application was submitted on 10 June 2022. Permission was granted on 28 February 2023, 9 months later. The site became operational on 31 January 2025, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11486.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode