Renewable sites › Tesco Extra Hazelmere
Tesco Extra Hazelmere
Tesco Extra Hazelmere is operational in Basildon with a recorded capacity of 0.4 MW, and has been generating since 2019-10-04.
Planning and build timeline
| Application submitted | 2019-01-07 |
| Permission granted | 2019-03-22 2 months after submission |
| Operational | 2019-10-04 6 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Basildon’s record on solar
Basildon has decided 12 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Basildon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pitsea Tipp Landfill Gas · Operational | 14 | 2.9 km |
Pitsea Landfill Scheme Landfill Gas · Operational | 11.6 | 2.9 km |
Nevendon Battery Storage Extension Battery · Operational | 5 | 3.4 km |
Nevendon Battery · Operational | 10 | 3.4 km |
Dollymans Storage Battery · Operational | 99.98 | 5.5 km |
Crays Hall Farm - Solar Arrays Solar Photovoltaics · Under Construction | 25.6 | 5.7 km |
Great Wheatley Road - Solar Farm Solar Photovoltaics · Under Construction | 30 | 6.9 km |
Ford Research And Engineering Centre, Dunton - Solar Farm Solar Photovoltaics · Operational | 5.2 | 7 km |
How big is Tesco Extra Hazelmere?
Tesco Extra Hazelmere has a recorded installed capacity of 0.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tesco Extra Hazelmere?
REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tesco Extra Hazelmere approved and built?
The application was submitted on 2019-01-07. Permission was granted on 2019-03-22, 2 months later. The site became operational on 2019-10-04, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7247.