Pitsea Landfill Scheme
Pitsea Landfill Scheme is an operational 11.6 MW landfill gas site in Basildon, generating since 10 January 2004. Planning permission was granted on 11 August 1998, 8 months after submission. Operator of record: Veolia.
Planning and build timeline
| Application submitted | 16 December 1997 |
| Permission granted | 11 August 1998 8 months after submission |
| Operational | 10 January 2004 65 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Basildon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pitsea Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
- Green Belt — Basildon
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 14 | 0.1 km |
Solar Photovoltaics · Operational | 0.4 | 2.9 km |
Battery · Operational | 10 | 6.4 km |
Battery · Operational | 5 | 6.4 km |
Battery · Operational | 99.98 | 7.3 km |
Landfill Gas · Operational | 3.8 | 7.7 km |
Landfill Gas · Operational | 3.9 | 7.7 km |
Solar Photovoltaics · Under Construction | 30 | 7.8 km |
How big is Pitsea Landfill Scheme?
Pitsea Landfill Scheme has a recorded installed capacity of 11.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pitsea Landfill Scheme?
REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pitsea Landfill Scheme approved and built?
The application was submitted on 16 December 1997. Permission was granted on 11 August 1998, 8 months later. The site became operational on 10 January 2004, 65 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 801.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode