National Grid Electricity Substation, Capenhurst Lane - Battery Storage

National Grid Electricity Substation, Capenhurst Lane - Battery Storage is operational in Cheshire West and Chester with a recorded capacity of 100 MW, and has been generating since 2023-02-11.

100 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-02-11
Battery
Technology
Zenobe Energy Limited
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted2020-10-07
Permission granted2021-02-01
4 months after submission
Operational2023-02-11
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire West and Chester’s record on battery storage

Cheshire West and Chester has decided 11 battery storage schemes and approved 91%, taking a median of 9.2 months. See every battery storage scheme decision in Cheshire West and Chester

Other built sites within 15 km

SiteMWDistance
Native River
Battery · Operational
571 km
Capenhurst Lane, Capenhurst - Battery storage
Battery · Under Construction
571.2 km
Longlooms Road East - Solar panels
Solar Photovoltaics · Operational
0.224.6 km
Shotwick Solar Farm
Solar Photovoltaics · Operational
72.25 km
Toyota Motor Manufacturing Uk - Deeside
Solar Photovoltaics · Operational
3.85.8 km
Parc Adfer EfW
EfW Incineration · Operational
165.8 km
Hooton Park
Advanced Conversion Technologies · Under Construction
286 km
Aldi Distribution Centre - Neston
Solar Photovoltaics · Operational
1.26.4 km

How big is National Grid Electricity Substation, Capenhurst Lane - Battery Storage?

National Grid Electricity Substation, Capenhurst Lane - Battery Storage has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates National Grid Electricity Substation, Capenhurst Lane - Battery Storage?

REPD records the operator as Zenobe Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was National Grid Electricity Substation, Capenhurst Lane - Battery Storage approved and built?

The application was submitted on 2020-10-07. Permission was granted on 2021-02-01, 4 months later. The site became operational on 2023-02-11, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12725.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council