Renewable sites › National Grid Electricity Substation, Capenhurst Lane - Battery Storage
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
National Grid Electricity Substation, Capenhurst Lane - Battery Storage is operational in Cheshire West and Chester with a recorded capacity of 100 MW, and has been generating since 2023-02-11.
Planning and build timeline
| Application submitted | 2020-10-07 |
| Permission granted | 2021-02-01 4 months after submission |
| Operational | 2023-02-11 24 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Cheshire West and Chester
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cheshire West and Chester’s record on battery storage
Cheshire West and Chester has decided 11 battery storage schemes and approved 91%, taking a median of 9.2 months. See every battery storage scheme decision in Cheshire West and Chester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Native River Battery · Operational | 57 | 1 km |
Capenhurst Lane, Capenhurst - Battery storage Battery · Under Construction | 57 | 1.2 km |
Longlooms Road East - Solar panels Solar Photovoltaics · Operational | 0.22 | 4.6 km |
Shotwick Solar Farm Solar Photovoltaics · Operational | 72.2 | 5 km |
Toyota Motor Manufacturing Uk - Deeside Solar Photovoltaics · Operational | 3.8 | 5.8 km |
Parc Adfer EfW EfW Incineration · Operational | 16 | 5.8 km |
Hooton Park Advanced Conversion Technologies · Under Construction | 28 | 6 km |
Aldi Distribution Centre - Neston Solar Photovoltaics · Operational | 1.2 | 6.4 km |
How big is National Grid Electricity Substation, Capenhurst Lane - Battery Storage?
National Grid Electricity Substation, Capenhurst Lane - Battery Storage has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates National Grid Electricity Substation, Capenhurst Lane - Battery Storage?
REPD records the operator as Zenobe Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was National Grid Electricity Substation, Capenhurst Lane - Battery Storage approved and built?
The application was submitted on 2020-10-07. Permission was granted on 2021-02-01, 4 months later. The site became operational on 2023-02-11, 24 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12725.
Novarly Parcel · official public data, read properly · parcel.novarly.com