Renewable sitesAldi Distribution Centre - Neston

Aldi Distribution Centre - Neston

Aldi Distribution Centre - Neston is an operational 1.2 MW solar farm in Cheshire West and Chester, generating since 24 March 2014. Planning permission was granted on 13 September 2013, 2 months after submission. Operator of record: Aldi.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 24 March 2014
Solar Photovoltaics
Technology
Aldi
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted9 July 2013
Permission granted13 September 2013
2 months after submission
Operational24 March 2014
6 months after consent

Screening a site of your own?

RedlineUK · £39

Cheshire West and Chester approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Aldi Distribution Centre - Neston’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire West and Chester’s record on solar

Cheshire West and Chester has decided 39 solar farms and approved 95%, taking a median of 1.7 months. See every solar farm decision in Cheshire West and Chester

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
72.25.4 km
EfW Incineration · Operational
165.9 km
Battery · Under Construction
576 km
Battery · Operational
576.4 km
Battery · Operational
1006.4 km
Advanced Conversion Technologies · Under Construction
286.8 km
Solar Photovoltaics · Operational
3.86.9 km
Landfill Gas · Operational
3.77.4 km

How big is Aldi Distribution Centre - Neston?

Aldi Distribution Centre - Neston has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aldi Distribution Centre - Neston?

REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aldi Distribution Centre - Neston approved and built?

The application was submitted on 9 July 2013. Permission was granted on 13 September 2013, 2 months later. The site became operational on 24 March 2014, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1390.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode