Renewable sitesCapenhurst Lane, Capenhurst - Battery storage

Capenhurst Lane, Capenhurst - Battery storage

Capenhurst Lane, Capenhurst - Battery storage is a 57 MW battery storage site under construction in Cheshire West and Chester. Planning permission was granted on 11 March 2022, 9 months after submission. Operator of record: HD888CAP Limited.

57 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
HD888CAP Limited
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted3 June 2021
Permission granted11 March 2022
9 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Cheshire West and Chester approves 91% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Capenhurst Lane, Capenhurst - Battery storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire West and Chester’s record on battery storage

Cheshire West and Chester has decided 11 battery storage schemes and approved 91%, taking a median of 9.2 months. See every battery storage scheme decision in Cheshire West and Chester

Other built sites within 15 km

SiteMWDistance
Battery · Operational
570.4 km
Battery · Operational
1001.2 km
Solar Photovoltaics · Operational
0.224.4 km
Advanced Conversion Technologies · Under Construction
284.7 km
Solar Photovoltaics · Operational
72.25.7 km
Solar Photovoltaics · Operational
1.26 km
EfW Incineration · Operational
166.6 km
Solar Photovoltaics · Operational
3.86.7 km

How big is Capenhurst Lane, Capenhurst - Battery storage?

Capenhurst Lane, Capenhurst - Battery storage has a recorded installed capacity of 57 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Capenhurst Lane, Capenhurst - Battery storage?

REPD records the operator as HD888CAP Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Capenhurst Lane, Capenhurst - Battery storage approved and built?

The application was submitted on 3 June 2021. Permission was granted on 11 March 2022, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9377.