Renewable sites › Toyota Motor Manufacturing Uk - Deeside
Toyota Motor Manufacturing Uk - Deeside
Toyota Motor Manufacturing Uk - Deeside is operational in Flintshire with a recorded capacity of 3.8 MW, and has been generating since 2014-08-26.
Planning and build timeline
| Application submitted | 2013-10-30 |
| Permission granted | 2013-12-19 2 months after submission |
| Operational | 2014-08-26 8 months after consent |
Flintshire’s record on solar
Flintshire has decided 11 solar farms and approved 82%, taking a median of 6.4 months. See every solar farm decision in Flintshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Parc Adfer EfW EfW Incineration · Operational | 16 | 1.2 km |
Shotwick Solar Farm Solar Photovoltaics · Operational | 72.2 | 1.5 km |
Crumps Yard Solar Farm Solar Photovoltaics · Operational | 1.6 | 2.2 km |
National Grid Electricity Substation, Capenhurst Lane - Battery Storage Battery · Operational | 100 | 5.8 km |
Native River Battery · Operational | 57 | 6.7 km |
Capenhurst Lane, Capenhurst - Battery storage Battery · Under Construction | 57 | 6.7 km |
Aldi Distribution Centre - Neston Solar Photovoltaics · Operational | 1.2 | 6.9 km |
Flint Landfill Site Castle Park Solar Photovoltaics · Operational | 2 | 8.3 km |
How big is Toyota Motor Manufacturing Uk - Deeside?
Toyota Motor Manufacturing Uk - Deeside has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Toyota Motor Manufacturing Uk - Deeside?
REPD records the operator as Toyota Motor Manufacturing. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Toyota Motor Manufacturing Uk - Deeside approved and built?
The application was submitted on 2013-10-30. Permission was granted on 2013-12-19, 2 months later. The site became operational on 2014-08-26, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2078.