Renewable sitesToyota Motor Manufacturing Uk - Deeside

Toyota Motor Manufacturing Uk - Deeside

Toyota Motor Manufacturing Uk - Deeside is operational in Flintshire with a recorded capacity of 3.8 MW, and has been generating since 2014-08-26.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-08-26
Solar Photovoltaics
Technology
Toyota Motor Manufacturing
Flintshire
Authority
Wales

Planning and build timeline

Application submitted2013-10-30
Permission granted2013-12-19
2 months after submission
Operational2014-08-26
8 months after consent

Flintshire’s record on solar

Flintshire has decided 11 solar farms and approved 82%, taking a median of 6.4 months. See every solar farm decision in Flintshire

Other built sites within 15 km

SiteMWDistance
Parc Adfer EfW
EfW Incineration · Operational
161.2 km
Shotwick Solar Farm
Solar Photovoltaics · Operational
72.21.5 km
Crumps Yard Solar Farm
Solar Photovoltaics · Operational
1.62.2 km
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Battery · Operational
1005.8 km
Native River
Battery · Operational
576.7 km
Capenhurst Lane, Capenhurst - Battery storage
Battery · Under Construction
576.7 km
Aldi Distribution Centre - Neston
Solar Photovoltaics · Operational
1.26.9 km
Flint Landfill Site Castle Park
Solar Photovoltaics · Operational
28.3 km

How big is Toyota Motor Manufacturing Uk - Deeside?

Toyota Motor Manufacturing Uk - Deeside has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Toyota Motor Manufacturing Uk - Deeside?

REPD records the operator as Toyota Motor Manufacturing. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Toyota Motor Manufacturing Uk - Deeside approved and built?

The application was submitted on 2013-10-30. Permission was granted on 2013-12-19, 2 months later. The site became operational on 2014-08-26, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2078.