Toyota Motor Manufacturing Uk - Deeside
Toyota Motor Manufacturing Uk - Deeside is an operational 3.8 MW solar farm in Flintshire, generating since 26 August 2014. Planning permission was granted on 19 December 2013, 2 months after submission. Operator of record: Toyota Motor Manufacturing.
Planning and build timeline
| Application submitted | 30 October 2013 |
| Permission granted | 19 December 2013 2 months after submission |
| Operational | 26 August 2014 8 months after consent |
Screening a site of your own?
Flintshire approves 82% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Toyota Motor Manufacturing Uk - Deeside’s recorded coordinate — swap in your own postcode or coordinates.
Flintshire’s record on solar
Flintshire has decided 11 solar farms and approved 82%, taking a median of 6.4 months. See every solar farm decision in Flintshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 16 | 1.2 km |
Solar Photovoltaics · Operational | 72.2 | 1.5 km |
Solar Photovoltaics · Operational | 1.6 | 2.2 km |
Battery · Operational | 100 | 5.8 km |
Battery · Operational | 57 | 6.7 km |
Battery · Under Construction | 57 | 6.7 km |
Solar Photovoltaics · Operational | 1.2 | 6.9 km |
Solar Photovoltaics · Operational | 2 | 8.3 km |
How big is Toyota Motor Manufacturing Uk - Deeside?
Toyota Motor Manufacturing Uk - Deeside has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Toyota Motor Manufacturing Uk - Deeside?
REPD records the operator as Toyota Motor Manufacturing. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Toyota Motor Manufacturing Uk - Deeside approved and built?
The application was submitted on 30 October 2013. Permission was granted on 19 December 2013, 2 months later. The site became operational on 26 August 2014, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2078.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode