Longlooms Road East - Solar panels

Longlooms Road East - Solar panels is an operational 0.22 MW solar farm in Cheshire West and Chester, generating since 1 January 2023. Planning permission was granted on 13 October 2022, 4 months after submission. Operator of record: Mercedes Benz (UK).

0.22 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2023
Solar Photovoltaics
Technology
Mercedes Benz (UK)
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted6 June 2022
Permission granted13 October 2022
4 months after submission
Operational1 January 2023
3 months after consent

Screening a site of your own?

RedlineUK · £39

Cheshire West and Chester approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Longlooms Road East - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire West and Chester’s record on solar

Cheshire West and Chester has decided 39 solar farms and approved 95%, taking a median of 1.7 months. See every solar farm decision in Cheshire West and Chester

Other built sites within 15 km

SiteMWDistance
Battery · Operational
574.1 km
Landfill Gas · Operational
64.4 km
Landfill Gas · Operational
1.64.4 km
Battery · Under Construction
574.4 km
Battery · Operational
1004.6 km
EfW Incineration · Under Construction
354.6 km
Advanced Conversion Technologies · Operational
21.55.1 km
Advanced Conversion Technologies · Under Construction
286.5 km

How big is Longlooms Road East - Solar panels?

Longlooms Road East - Solar panels has a recorded installed capacity of 0.22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Longlooms Road East - Solar panels?

REPD records the operator as Mercedes Benz (UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Longlooms Road East - Solar panels approved and built?

The application was submitted on 6 June 2022. Permission was granted on 13 October 2022, 4 months later. The site became operational on 1 January 2023, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11567.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode