Renewable sites › Longlooms Road East - Solar panels
Longlooms Road East - Solar panels
Longlooms Road East - Solar panels is operational in Cheshire West and Chester with a recorded capacity of 0.22 MW, and has been generating since 2023-01-01.
Planning and build timeline
| Application submitted | 2022-06-06 |
| Permission granted | 2022-10-13 4 months after submission |
| Operational | 2023-01-01 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cheshire West and Chester’s record on solar
Cheshire West and Chester has decided 39 solar farms and approved 95%, taking a median of 1.7 months. See every solar farm decision in Cheshire West and Chester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Native River Battery · Operational | 57 | 4.1 km |
Gowy Landfill Site, Cheshire (Extension) Landfill Gas · Operational | 6 | 4.4 km |
Gowy Landfill Site Landfill Gas · Operational | 1.6 | 4.4 km |
Capenhurst Lane, Capenhurst - Battery storage Battery · Under Construction | 57 | 4.4 km |
National Grid Electricity Substation, Capenhurst Lane - Battery Storage Battery · Operational | 100 | 4.6 km |
Plot 8 Protos/Ince Marshes EfW Incineration · Under Construction | 35 | 4.6 km |
Ince Bio Power Advanced Conversion Technologies · Operational | 21.5 | 5.1 km |
Hooton Park Advanced Conversion Technologies · Under Construction | 28 | 6.5 km |
How big is Longlooms Road East - Solar panels?
Longlooms Road East - Solar panels has a recorded installed capacity of 0.22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Longlooms Road East - Solar panels?
REPD records the operator as Mercedes Benz (UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Longlooms Road East - Solar panels approved and built?
The application was submitted on 2022-06-06. Permission was granted on 2022-10-13, 4 months later. The site became operational on 2023-01-01, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11567.
Novarly Parcel · official public data, read properly · parcel.novarly.com