Parc Adfer EfW

Parc Adfer EfW is an operational 16 MW energy-from-waste plant in Flintshire, generating since 2 January 2020. Planning permission was granted on 9 June 2015, 9 months after submission. Operator of record: Wheelabrator.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 2 January 2020
EfW Incineration
Technology
Wheelabrator
Flintshire
Authority
Wales

Planning and build timeline

Application submitted22 September 2014
Permission granted9 June 2015
9 months after submission
Operational2 January 2020
55 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Flintshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Parc Adfer EfW’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
72.20.9 km
Solar Photovoltaics · Operational
3.81.2 km
Solar Photovoltaics · Operational
1.62.3 km
Battery · Operational
1005.8 km
Solar Photovoltaics · Operational
1.25.9 km
Battery · Under Construction
576.6 km
Battery · Operational
576.7 km
Solar Photovoltaics · Operational
27.3 km

How big is Parc Adfer EfW?

Parc Adfer EfW has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Parc Adfer EfW?

REPD records the operator as Wheelabrator. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Parc Adfer EfW approved and built?

The application was submitted on 22 September 2014. Permission was granted on 9 June 2015, 9 months later. The site became operational on 2 January 2020, 55 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1001.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode