Shotwick Solar Farm is an operational 72.2 MW solar farm in Flintshire, generating since 31 March 2016. Planning permission was granted on 1 June 2015, 15 months after submission. Operator of record: Foresight Solar Fund.

72.2 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2016
Solar Photovoltaics
Technology
Foresight Solar Fund
Flintshire
Authority
Wales

Planning and build timeline

Application submitted21 February 2014
Permission granted1 June 2015
15 months after submission
Operational31 March 2016
10 months after consent

Screening a site of your own?

RedlineUK · £39

Flintshire approves 82% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Shotwick Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Flintshire’s record on solar

Flintshire has decided 11 solar farms and approved 82%, taking a median of 6.4 months. See every solar farm decision in Flintshire

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
160.9 km
Solar Photovoltaics · Operational
3.81.5 km
Solar Photovoltaics · Operational
1.63.2 km
Battery · Operational
1005 km
Solar Photovoltaics · Operational
1.25.4 km
Battery · Under Construction
575.7 km
Battery · Operational
575.8 km
Solar Photovoltaics · Operational
28 km

How big is Shotwick Solar Farm?

Shotwick Solar Farm has a recorded installed capacity of 72.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shotwick Solar Farm?

REPD records the operator as Foresight Solar Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shotwick Solar Farm approved and built?

The application was submitted on 21 February 2014. Permission was granted on 1 June 2015, 15 months later. The site became operational on 31 March 2016, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2347.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode