Novarly ParcelRenewable sites

Renewable sitesMossmorran Wind Farm

Mossmorran Wind Farm

Mossmorran Wind Farm is operational in Fife with a recorded capacity of 4.6 MW, and has been generating since 2015-12-01.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-01
Wind Onshore
Technology
Airvolution Energy
Fife
Authority
Scotland

Planning and build timeline

Application submitted2011-04-01
Permission granted2012-01-13
9 months after submission
Operational2015-12-01
47 months after consent

Fife’s record on onshore wind

Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife

Other built sites within 15 km

SiteMWDistance
Goathill Quarry Turbine
Wind Onshore · Operational
20.5 km
Camilla Battery Storage
Battery · Operational
49.993.8 km
Clentrie Wind Farm (Gevens)
Wind Onshore · Operational
6.95.1 km
Little Raith Farm
Wind Onshore · Operational
255.2 km
Dunfermline EDI4
Solar Photovoltaics · Operational
1.95.4 km
Westfield Biomass Power Station
Biomass (dedicated) · Operational
12.55.8 km
Westfield
Wind Onshore · Operational
106.3 km
Westfield (former Opencast Coal Mine)
EfW Incineration · Under Construction
23.77.4 km

How big is Mossmorran Wind Farm?

Mossmorran Wind Farm has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mossmorran Wind Farm?

REPD records the operator as Airvolution Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mossmorran Wind Farm approved and built?

The application was submitted on 2011-04-01. Permission was granted on 2012-01-13, 9 months later. The site became operational on 2015-12-01, 47 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2780.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council