Renewable sites › Dunfermline EDI4
Dunfermline EDI4
Dunfermline EDI4 is operational in Fife with a recorded capacity of 1.9 MW, and has been generating since 2019-01-01.
Planning and build timeline
| Application submitted | 2018-08-06 |
| Permission granted | not recorded |
| Operational | 2019-01-01 |
Fife’s record on solar
Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
F M C Land, Pitreavie Business Park Wind Onshore · Operational | 1.5 | 3.5 km |
FMC Technologies Wind Onshore · Operational | 1.5 | 3.6 km |
Goathill Quarry Turbine Wind Onshore · Operational | 2 | 5.1 km |
St Margarets Bay Solar Photovoltaics · Operational | 0.2 | 5.1 km |
Mossmorran Wind Farm Wind Onshore · Operational | 4.6 | 5.4 km |
Dunfermline North - Solar Photovoltaic Array/Battery storage Battery · Under Construction | 20 | 6.1 km |
Dunfermline North - Solar Photovoltaic Array/Battery storage Solar Photovoltaics · Under Construction | 29.9 | 6.1 km |
Lochhead Landfill CHP Anaerobic Digestion · Operational | 1.7 | 6.1 km |
How big is Dunfermline EDI4?
Dunfermline EDI4 has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dunfermline EDI4?
REPD records the operator as Amazon UK Services/ Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dunfermline EDI4 approved and built?
The application was submitted on 2018-08-06. REPD does not record a grant date. The site became operational on 2019-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6726.