Novarly ParcelRenewable sites

Renewable sitesWestfield (former Opencast Coal Mine)

Westfield (former Opencast Coal Mine)

Westfield (former Opencast Coal Mine) is a 23.7 MW energy-from-waste plant under construction in Fife. Planning permission was granted on 7 February 2019, 6 months after submission. Operator of record: Brockwell Energy.

23.7 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Brockwell Energy
Fife
Authority
Scotland

Planning and build timeline

Application submitted16 August 2018
Permission granted7 February 2019
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Westfield (former Opencast Coal Mine)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
102.2 km
Biomass (dedicated) · Operational
12.52.9 km
Wind Onshore · Operational
253.4 km
Wind Onshore · Operational
6.93.6 km
Solar Photovoltaics · Operational
0.33.9 km
Anaerobic Digestion · Operational
24.4 km
Battery · Operational
49.994.5 km
Wind Onshore · Operational
6.46 km

How big is Westfield (former Opencast Coal Mine)?

Westfield (former Opencast Coal Mine) has a recorded installed capacity of 23.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Westfield (former Opencast Coal Mine)?

REPD records the operator as Brockwell Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Westfield (former Opencast Coal Mine) approved and built?

The application was submitted on 16 August 2018. Permission was granted on 7 February 2019, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6262.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode