Renewable sites › Little Raith Farm
Little Raith Farm
Little Raith Farm is an operational 25 MW onshore wind farm in Fife, generating since 27 November 2012. Planning permission was granted on 8 March 2007, 27 months after submission. Operator of record: Renewables Infrastructure Group.
Planning and build timeline
| Application submitted | 2 December 2004 |
| Permission granted | 8 March 2007 27 months after submission |
| Operational | 27 November 2012 69 months after consent |
Screening a site of your own?
Fife approves 54% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Little Raith Farm’s recorded coordinate — swap in your own postcode or coordinates.
Fife’s record on onshore wind
Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 6.9 | 0.2 km |
Battery · Operational | 49.99 | 1.4 km |
EfW Incineration · Under Construction | 23.7 | 3.4 km |
Wind Onshore · Operational | 10 | 3.9 km |
Biomass (dedicated) · Operational | 12.5 | 4.1 km |
Wind Onshore · Operational | 4.6 | 5.2 km |
Wind Onshore · Operational | 2 | 5.6 km |
Solar Photovoltaics · Operational | 0.65 | 6.4 km |
How big is Little Raith Farm?
Little Raith Farm has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Little Raith Farm?
REPD records the operator as Renewables Infrastructure Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Little Raith Farm approved and built?
The application was submitted on 2 December 2004. Permission was granted on 8 March 2007, 27 months later. The site became operational on 27 November 2012, 69 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4034.