Westfield Biomass Power Station
Westfield Biomass Power Station is operational in Fife with a recorded capacity of 12.5 MW, and has been generating since 2000-08-21.
Planning and build timeline
| Application submitted | 1994-03-03 |
| Permission granted | 1995-12-05 21 months after submission |
| Operational | 2000-08-21 57 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Westfield Wind Onshore · Operational | 10 | 0.7 km |
Westfield (former Opencast Coal Mine) EfW Incineration · Under Construction | 23.7 | 2.9 km |
Little Raith Farm Wind Onshore · Operational | 25 | 4.1 km |
Clentrie Wind Farm (Gevens) Wind Onshore · Operational | 6.9 | 4.2 km |
Camilla Battery Storage Battery · Operational | 49.99 | 4.4 km |
Mossmorran Wind Farm Wind Onshore · Operational | 4.6 | 5.8 km |
Finmont Service Reservoir Solar Photovoltaics · Operational | 0.3 | 6.1 km |
Goathill Quarry Turbine Wind Onshore · Operational | 2 | 6.2 km |
How big is Westfield Biomass Power Station?
Westfield Biomass Power Station has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Westfield Biomass Power Station?
REPD records the operator as EPR Scotland. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Westfield Biomass Power Station approved and built?
The application was submitted on 1994-03-03. Permission was granted on 1995-12-05, 21 months later. The site became operational on 2000-08-21, 57 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 62.