Westfield Biomass Power Station
Westfield Biomass Power Station is an operational 12.5 MW biomass plant in Fife, generating since 21 August 2000. Planning permission was granted on 5 December 1995, 21 months after submission. Operator of record: EPR Scotland.
Planning and build timeline
| Application submitted | 3 March 1994 |
| Permission granted | 5 December 1995 21 months after submission |
| Operational | 21 August 2000 57 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Westfield Biomass Power Station’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 10 | 0.7 km |
EfW Incineration · Under Construction | 23.7 | 2.9 km |
Wind Onshore · Operational | 25 | 4.1 km |
Wind Onshore · Operational | 6.9 | 4.2 km |
Battery · Operational | 49.99 | 4.4 km |
Wind Onshore · Operational | 4.6 | 5.8 km |
Solar Photovoltaics · Operational | 0.3 | 6.1 km |
Wind Onshore · Operational | 2 | 6.2 km |
How big is Westfield Biomass Power Station?
Westfield Biomass Power Station has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Westfield Biomass Power Station?
REPD records the operator as EPR Scotland. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Westfield Biomass Power Station approved and built?
The application was submitted on 3 March 1994. Permission was granted on 5 December 1995, 21 months later. The site became operational on 21 August 2000, 57 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 62.