Medebridge Road - Solar Farm is operational in Thurrock with a recorded capacity of 49.9 MW, and has been generating since 2025-09-01.
Planning and build timeline
| Application submitted | 2022-02-14 |
| Permission granted | 2022-05-10 3 months after submission |
| Operational | 2025-09-01 40 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Thurrock’s record on solar
Thurrock has decided 17 solar farms and approved 94%, taking a median of 2.4 months. See every solar farm decision in Thurrock →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ockendon 'B' Landfill Scheme Landfill Gas · Operational | 4.5 | 1.4 km |
Little Belhus Restoration Site Wind Onshore · Operational | 1 | 1.6 km |
Ockendon Area III Landfill Gas · Operational | 8.5 | 2.4 km |
Ockendon Landfill Solar Farm Solar Photovoltaics · Operational | 38 | 2.6 km |
Sandy Lane Landfill Scheme Landfill Gas · Operational | 2.3 | 3.5 km |
Fen Lane, Bulphan Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 4 km |
Aveley Landfill Scheme Landfill Gas · Operational | 2.1 | 4 km |
Aveley Landfill Gas · Operational | 1.2 | 4.1 km |
How big is Medebridge Road - Solar Farm?
Medebridge Road - Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Medebridge Road - Solar Farm?
REPD records the operator as Medebridge Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Medebridge Road - Solar Farm approved and built?
The application was submitted on 2022-02-14. Permission was granted on 2022-05-10, 3 months later. The site became operational on 2025-09-01, 40 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10369.