Novarly ParcelRenewable sites

Renewable sitesLittle Belhus Restoration Site

Little Belhus Restoration Site

Little Belhus Restoration Site is operational in Thurrock with a recorded capacity of 1 MW, and has been generating since 2016-09-23.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-09-23
Wind Onshore
Technology
Constantine Wind Energy
Thurrock
Authority
England

Planning and build timeline

Application submitted2013-11-15
Permission granted2015-05-14
18 months after submission
Operational2016-09-23
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Medebridge Road - Solar Farm
Solar Photovoltaics · Operational
49.91.6 km
Ockendon 'B' Landfill Scheme
Landfill Gas · Operational
4.52.5 km
Ockendon Area III
Landfill Gas · Operational
8.52.8 km
Ockendon Landfill Solar Farm
Solar Photovoltaics · Operational
382.9 km
Sandy Lane Landfill Scheme
Landfill Gas · Operational
2.33.2 km
Clay Tye Farm Phase 2 - Storage Facility
Battery · Operational
49.53.5 km
Clay Tye Farm Phase 1 - Storage Facility
Battery · Operational
49.53.5 km
Aveley Landfill Scheme
Landfill Gas · Operational
2.13.6 km

How big is Little Belhus Restoration Site?

Little Belhus Restoration Site has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Little Belhus Restoration Site?

REPD records the operator as Constantine Wind Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Little Belhus Restoration Site approved and built?

The application was submitted on 2013-11-15. Permission was granted on 2015-05-14, 18 months later. The site became operational on 2016-09-23, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3437.