Aveley Landfill Scheme
Aveley Landfill Scheme is an operational 2.1 MW landfill gas site in Thurrock, generating since 20 July 1999. Planning permission was granted on 4 June 1998, 5 months after submission. Operator of record: Waste Recycling Group.
Planning and build timeline
| Application submitted | 13 January 1998 |
| Permission granted | 4 June 1998 5 months after submission |
| Operational | 20 July 1999 14 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Thurrock: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Aveley Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Thurrock
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.2 | 0.1 km |
Landfill Gas · Operational | 2.3 | 0.6 km |
Landfill Gas · Operational | 17 | 3.2 km |
Landfill Gas · Operational | 3.9 | 3.2 km |
Wind Onshore · Operational | 1 | 3.6 km |
Sewage Sludge Digestion · Operational | 4 | 3.7 km |
Solar Photovoltaics · Operational | 49.9 | 4 km |
Sewage Sludge Digestion · Operational | 1.1 | 4.2 km |
How big is Aveley Landfill Scheme?
Aveley Landfill Scheme has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Aveley Landfill Scheme?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aveley Landfill Scheme approved and built?
The application was submitted on 13 January 1998. Permission was granted on 4 June 1998, 5 months later. The site became operational on 20 July 1999, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 510.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode