Renewable sitesAveley Landfill Scheme

Aveley Landfill Scheme

Aveley Landfill Scheme is operational in Thurrock with a recorded capacity of 2.1 MW, and has been generating since 1999-07-20.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-07-20
Landfill Gas
Technology
Waste Recycling Group
Thurrock
Authority
England

Planning and build timeline

Application submitted1998-01-13
Permission granted1998-06-04
5 months after submission
Operational1999-07-20
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Aveley
Landfill Gas · Operational
1.20.1 km
Sandy Lane Landfill Scheme
Landfill Gas · Operational
2.30.6 km
Rainham Landfill Scheme, Phase I
Landfill Gas · Operational
3.93.2 km
Rainham Phase II
Landfill Gas · Operational
173.2 km
Little Belhus Restoration Site
Wind Onshore · Operational
13.6 km
Riverside Sewage Treatment Works Digestion Plant
Sewage Sludge Digestion · Operational
43.7 km
Medebridge Road - Solar Farm
Solar Photovoltaics · Operational
49.94 km
Longreach STW - extension
Sewage Sludge Digestion · Operational
1.14.2 km

How big is Aveley Landfill Scheme?

Aveley Landfill Scheme has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aveley Landfill Scheme?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aveley Landfill Scheme approved and built?

The application was submitted on 1998-01-13. Permission was granted on 1998-06-04, 5 months later. The site became operational on 1999-07-20, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 510.