Renewable sitesOckendon Area III

Ockendon Area III

Ockendon Area III is operational in Thurrock with a recorded capacity of 8.5 MW, and has been generating since 2002-04-01.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-04-01
Landfill Gas
Technology
ENERGY DEVELOPMENTS (UK) LTD
Thurrock
Authority
England

Planning and build timeline

Application submitted1999-12-10
Permission granted2000-07-19
7 months after submission
Operational2002-04-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Ockendon Landfill Solar Farm
Solar Photovoltaics · Operational
380.2 km
Ockendon 'B' Landfill Scheme
Landfill Gas · Operational
4.51.3 km
Fen Lane, Bulphan Solar Farm
Solar Photovoltaics · Under Construction
49.91.8 km
Bulphan Fen Solar Farm & Battery Storage
Solar Photovoltaics · Under Construction
49.92.2 km
Bulphan Fen Solar Farm & Battery Storage
Battery · Under Construction
2.2 km
Medebridge Road - Solar Farm
Solar Photovoltaics · Operational
49.92.4 km
Little Belhus Restoration Site
Wind Onshore · Operational
12.8 km
Clay Tye Farm Phase 1 - Storage Facility
Battery · Operational
49.53.4 km

How big is Ockendon Area III?

Ockendon Area III has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ockendon Area III?

REPD records the operator as ENERGY DEVELOPMENTS (UK) LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ockendon Area III approved and built?

The application was submitted on 1999-12-10. Permission was granted on 2000-07-19, 7 months later. The site became operational on 2002-04-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 518.