Sandy Lane Landfill Scheme
Sandy Lane Landfill Scheme is operational in Thurrock with a recorded capacity of 2.3 MW, and has been generating since 2006-08-01.
Planning and build timeline
| Application submitted | 1994-03-04 |
| Permission granted | 2003-12-09 117 months after submission |
| Operational | 2006-08-01 32 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Thurrock
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Aveley Landfill Scheme Landfill Gas · Operational | 2.1 | 0.6 km |
Aveley Landfill Gas · Operational | 1.2 | 0.7 km |
Little Belhus Restoration Site Wind Onshore · Operational | 1 | 3.2 km |
Medebridge Road - Solar Farm Solar Photovoltaics · Operational | 49.9 | 3.5 km |
Rainham Phase II Landfill Gas · Operational | 17 | 3.8 km |
Rainham Landfill Scheme, Phase I Landfill Gas · Operational | 3.9 | 3.8 km |
Longreach STW - extension Sewage Sludge Digestion · Operational | 1.1 | 4.2 km |
Riverside Sewage Treatment Works Digestion Plant Sewage Sludge Digestion · Operational | 4 | 4.3 km |
How big is Sandy Lane Landfill Scheme?
Sandy Lane Landfill Scheme has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sandy Lane Landfill Scheme?
REPD records the operator as Aveley Methane Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sandy Lane Landfill Scheme approved and built?
The application was submitted on 1994-03-04. Permission was granted on 2003-12-09, 117 months later. The site became operational on 2006-08-01, 32 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 506.