Sandy Lane Landfill Scheme
Sandy Lane Landfill Scheme is an operational 2.3 MW landfill gas site in Thurrock, generating since 1 August 2006. Planning permission was granted on 9 December 2003, 117 months after submission. Operator of record: Aveley Methane Ltd.
Planning and build timeline
| Application submitted | 4 March 1994 |
| Permission granted | 9 December 2003 117 months after submission |
| Operational | 1 August 2006 32 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Thurrock: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sandy Lane Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Thurrock
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 2.1 | 0.6 km |
Landfill Gas · Operational | 1.2 | 0.7 km |
Wind Onshore · Operational | 1 | 3.2 km |
Solar Photovoltaics · Operational | 49.9 | 3.5 km |
Landfill Gas · Operational | 3.9 | 3.8 km |
Landfill Gas · Operational | 17 | 3.8 km |
Sewage Sludge Digestion · Operational | 1.1 | 4.2 km |
Sewage Sludge Digestion · Operational | 4 | 4.3 km |
How big is Sandy Lane Landfill Scheme?
Sandy Lane Landfill Scheme has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sandy Lane Landfill Scheme?
REPD records the operator as Aveley Methane Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sandy Lane Landfill Scheme approved and built?
The application was submitted on 4 March 1994. Permission was granted on 9 December 2003, 117 months later. The site became operational on 1 August 2006, 32 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 506.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode