Renewable sites › Fen Lane, Bulphan Solar Farm
Fen Lane, Bulphan Solar Farm
Fen Lane, Bulphan Solar Farm is a 49.9 MW solar farm under construction in Havering. Planning permission was granted on 30 July 2021, 6 months after submission. Operator of record: DIF Capital Partners.
Planning and build timeline
| Application submitted | 14 January 2021 |
| Permission granted | 30 July 2021 6 months after submission |
| Operational | not recorded |
Screening a site of your own?
Havering approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Fen Lane, Bulphan Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Havering
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Havering’s record on solar
Havering has decided 10 solar farms and approved 80%, taking a median of 2.8 months. See every solar farm decision in Havering →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | — | 1.3 km |
Solar Photovoltaics · Under Construction | 49.9 | 1.3 km |
Solar Photovoltaics · Operational | 38 | 1.7 km |
Landfill Gas · Operational | 8.5 | 1.8 km |
Battery · Operational | 49.5 | 2.3 km |
Battery · Operational | 49.5 | 2.3 km |
Landfill Gas · Operational | 4.5 | 3.1 km |
Solar Photovoltaics · Operational | 2.6 | 3.4 km |
How big is Fen Lane, Bulphan Solar Farm?
Fen Lane, Bulphan Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Fen Lane, Bulphan Solar Farm?
REPD records the operator as DIF Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Fen Lane, Bulphan Solar Farm approved and built?
The application was submitted on 14 January 2021. Permission was granted on 30 July 2021, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8411.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode