Novarly ParcelRenewable sites

Renewable sitesFen Lane, Bulphan Solar Farm

Fen Lane, Bulphan Solar Farm

Fen Lane, Bulphan Solar Farm is a 49.9 MW solar farm under construction in Havering. Planning permission was granted on 30 July 2021, 6 months after submission. Operator of record: DIF Capital Partners.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
DIF Capital Partners
Havering
Authority
England

Planning and build timeline

Application submitted14 January 2021
Permission granted30 July 2021
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Havering approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fen Lane, Bulphan Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Havering’s record on solar

Havering has decided 10 solar farms and approved 80%, taking a median of 2.8 months. See every solar farm decision in Havering

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
1.3 km
Solar Photovoltaics · Under Construction
49.91.3 km
Solar Photovoltaics · Operational
381.7 km
Landfill Gas · Operational
8.51.8 km
Battery · Operational
49.52.3 km
Battery · Operational
49.52.3 km
Landfill Gas · Operational
4.53.1 km
Solar Photovoltaics · Operational
2.63.4 km

How big is Fen Lane, Bulphan Solar Farm?

Fen Lane, Bulphan Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fen Lane, Bulphan Solar Farm?

REPD records the operator as DIF Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fen Lane, Bulphan Solar Farm approved and built?

The application was submitted on 14 January 2021. Permission was granted on 30 July 2021, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8411.