Novarly ParcelRenewable sites

Renewable sitesFen Lane, Bulphan Solar Farm

Fen Lane, Bulphan Solar Farm

Fen Lane, Bulphan Solar Farm is under construction in Havering with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
DIF Capital Partners
Havering
Authority
England

Planning and build timeline

Application submitted2021-01-14
Permission granted2021-07-30
6 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Havering’s record on solar

Havering has decided 10 solar farms and approved 80%, taking a median of 2.8 months. See every solar farm decision in Havering

Other built sites within 15 km

SiteMWDistance
Bulphan Fen Solar Farm & Battery Storage
Battery · Under Construction
1.3 km
Bulphan Fen Solar Farm & Battery Storage
Solar Photovoltaics · Under Construction
49.91.3 km
Ockendon Landfill Solar Farm
Solar Photovoltaics · Operational
381.7 km
Ockendon Area III
Landfill Gas · Operational
8.51.8 km
Clay Tye Farm Phase 2 - Storage Facility
Battery · Operational
49.52.3 km
Clay Tye Farm Phase 1 - Storage Facility
Battery · Operational
49.52.3 km
Ockendon 'B' Landfill Scheme
Landfill Gas · Operational
4.53.1 km
Cranham Golf Course Solar Park
Solar Photovoltaics · Operational
2.63.4 km

How big is Fen Lane, Bulphan Solar Farm?

Fen Lane, Bulphan Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fen Lane, Bulphan Solar Farm?

REPD records the operator as DIF Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fen Lane, Bulphan Solar Farm approved and built?

The application was submitted on 2021-01-14. Permission was granted on 2021-07-30, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8411.

Novarly Parcel · official public data, read properly · parcel.novarly.com