Marshill Farm

Marshill Farm is an operational 1.5 MW onshore wind farm in South Lanarkshire, generating since 1 August 2015. Planning permission was granted on 18 December 2013, 17 months after submission. Operator of record: Green Cat Renewables.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2015
Wind Onshore
Technology
Green Cat Renewables
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted9 July 2012
Permission granted18 December 2013
17 months after submission
Operational1 August 2015
19 months after consent

Screening a site of your own?

RedlineUK · £39

South Lanarkshire approves 73% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Marshill Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
63.2 km
Wind Onshore · Operational
2.44.3 km
Wind Onshore · Operational
2.24.5 km
Wind Onshore · Operational
2.66.2 km
Wind Onshore · Operational
367.7 km
Wind Onshore · Operational
67.28.9 km
Wind Onshore · Operational
88.48.9 km
Battery · Operational
49.999.1 km

How big is Marshill Farm?

Marshill Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marshill Farm?

REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marshill Farm approved and built?

The application was submitted on 9 July 2012. Permission was granted on 18 December 2013, 17 months later. The site became operational on 1 August 2015, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6106.