Woodlands Wind Farm is an operational 2.6 MW onshore wind farm in South Lanarkshire, generating since 28 July 2016. Planning permission was granted on 22 July 2013, 16 months after submission. Operator of record: WhiteRock Energy.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 28 July 2016
Wind Onshore
Technology
WhiteRock Energy
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted22 March 2012
Permission granted22 July 2013
16 months after submission
Operational28 July 2016
36 months after consent

Screening a site of your own?

RedlineUK · £39

South Lanarkshire approves 73% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Woodlands Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.41.9 km
Wind Onshore · Operational
153.8 km
Battery · Under Construction
404.1 km
Wind Onshore · Under Construction
1264.1 km
Battery · Under Construction
5004.6 km
Wind Onshore · Operational
364.8 km
Wind Onshore · Under Construction
785.3 km
Battery · Under Construction
205.3 km

How big is Woodlands Wind Farm?

Woodlands Wind Farm has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woodlands Wind Farm?

REPD records the operator as WhiteRock Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woodlands Wind Farm approved and built?

The application was submitted on 22 March 2012. Permission was granted on 22 July 2013, 16 months later. The site became operational on 28 July 2016, 36 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6173.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode