Renewable sitesWoodlands Wind Farm

Woodlands Wind Farm

Woodlands Wind Farm is operational in South Lanarkshire with a recorded capacity of 2.6 MW, and has been generating since 2016-07-28.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-07-28
Wind Onshore
Technology
WhiteRock Energy
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2012-03-22
Permission granted2013-07-22
16 months after submission
Operational2016-07-28
36 months after consent

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
LADEHEAD FARM - WIND TURBINES
Wind Onshore · Operational
2.41.9 km
Nutberry Wind Farm
Wind Onshore · Operational
153.8 km
Cumberhead West Wind Farm
Wind Onshore · Under Construction
1264.1 km
Cumberhead West Wind Farm
Battery · Under Construction
404.1 km
Coalburn Energy - Battery Storage
Battery · Under Construction
5004.6 km
Auchrobert Wind Farm
Wind Onshore · Operational
364.8 km
Douglas West Wind Farm (extension)
Battery · Under Construction
205.3 km
Douglas West and Dalquhandy Renewable Energy Project
Wind Onshore · Operational
455.3 km

How big is Woodlands Wind Farm?

Woodlands Wind Farm has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woodlands Wind Farm?

REPD records the operator as WhiteRock Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woodlands Wind Farm approved and built?

The application was submitted on 2012-03-22. Permission was granted on 2013-07-22, 16 months later. The site became operational on 2016-07-28, 36 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6173.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council