Renewable sites › Auchrobert Wind Farm
Auchrobert Wind Farm
Auchrobert Wind Farm is operational in South Lanarkshire with a recorded capacity of 36 MW, and has been generating since 2017-03-20.
Planning and build timeline
| Application submitted | 2012-12-14 |
| Permission granted | 2014-04-09 16 months after submission |
| Operational | 2017-03-20 35 months after consent |
South Lanarkshire’s record on onshore wind
South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kype Muir Wind Farm Extension Wind Onshore · Operational | 67.2 | 3.4 km |
Kype Muir Wind Farm Wind Onshore · Operational | 88.4 | 3.4 km |
Woodlands Wind Farm Wind Onshore · Operational | 2.6 | 4.8 km |
Nutberry Wind Farm Wind Onshore · Operational | 15 | 4.8 km |
LADEHEAD FARM - WIND TURBINES Wind Onshore · Operational | 2.4 | 4.8 km |
Cumberhead Wind Farm Wind Onshore · Operational | 48 | 6 km |
Cumberhead West Wind Farm Wind Onshore · Under Construction | 126 | 6.7 km |
Cumberhead West Wind Farm Battery · Under Construction | 40 | 6.7 km |
How big is Auchrobert Wind Farm?
Auchrobert Wind Farm has a recorded installed capacity of 36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Auchrobert Wind Farm?
REPD records the operator as Falck Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Auchrobert Wind Farm approved and built?
The application was submitted on 2012-12-14. Permission was granted on 2014-04-09, 16 months later. The site became operational on 2017-03-20, 35 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4337.
Novarly Parcel · official public data, read properly · parcel.novarly.com