Novarly ParcelRenewable sites

Renewable sitesAuchrobert Wind Farm

Auchrobert Wind Farm

Auchrobert Wind Farm is operational in South Lanarkshire with a recorded capacity of 36 MW, and has been generating since 2017-03-20.

36 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-20
Wind Onshore
Technology
Falck Renewables
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2012-12-14
Permission granted2014-04-09
16 months after submission
Operational2017-03-20
35 months after consent

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Kype Muir Wind Farm Extension
Wind Onshore · Operational
67.23.4 km
Kype Muir Wind Farm
Wind Onshore · Operational
88.43.4 km
Woodlands Wind Farm
Wind Onshore · Operational
2.64.8 km
Nutberry Wind Farm
Wind Onshore · Operational
154.8 km
LADEHEAD FARM - WIND TURBINES
Wind Onshore · Operational
2.44.8 km
Cumberhead Wind Farm
Wind Onshore · Operational
486 km
Cumberhead West Wind Farm
Wind Onshore · Under Construction
1266.7 km
Cumberhead West Wind Farm
Battery · Under Construction
406.7 km

How big is Auchrobert Wind Farm?

Auchrobert Wind Farm has a recorded installed capacity of 36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Auchrobert Wind Farm?

REPD records the operator as Falck Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Auchrobert Wind Farm approved and built?

The application was submitted on 2012-12-14. Permission was granted on 2014-04-09, 16 months later. The site became operational on 2017-03-20, 35 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4337.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council