Long Meadow Solar Farm is an operational 19 MW solar farm in Uttlesford, generating since 1 June 2025. Planning permission was granted on 21 April 2023, 27 months after submission. Operator of record: Low Carbon Solar Park 4 Limited.

19 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2025
Solar Photovoltaics
Technology
Low Carbon Solar Park 4 Limited
Uttlesford
Authority
England

Planning and build timeline

Application submitted21 January 2021
Permission granted21 April 2023
27 months after submission
Operational1 June 2025
25 months after consent

Screening a site of your own?

RedlineUK · £39

Uttlesford approves 89% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Long Meadow Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on solar

Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
17.2 km
Solar Photovoltaics · Operational
127.3 km
Solar Photovoltaics · Operational
447.4 km
Solar Photovoltaics · Operational
10.89.1 km
Landfill Gas · Operational
1.19.4 km
Solar Photovoltaics · Operational
4.99.5 km
Solar Photovoltaics · Operational
2.0412.9 km
Solar Photovoltaics · Under Construction
14.313.4 km

How big is Long Meadow Solar Farm?

Long Meadow Solar Farm has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Long Meadow Solar Farm?

REPD records the operator as Low Carbon Solar Park 4 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Long Meadow Solar Farm approved and built?

The application was submitted on 21 January 2021. Permission was granted on 21 April 2023, 27 months later. The site became operational on 1 June 2025, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8824.