Long Meadow Solar Farm is operational in Uttlesford with a recorded capacity of 19 MW, and has been generating since 2025-06-01.

19 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-06-01
Solar Photovoltaics
Technology
Low Carbon Solar Park 4 Limited
Uttlesford
Authority
England

Planning and build timeline

Application submitted2021-01-21
Permission granted2023-04-21
27 months after submission
Operational2025-06-01
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on solar

Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
Station Works AD
Anaerobic Digestion · Operational
17.2 km
Spriggs Farm
Solar Photovoltaics · Operational
127.3 km
Terriers Farm
Solar Photovoltaics · Operational
447.4 km
Hyde Farm
Solar Photovoltaics · Operational
10.89.1 km
Ugley
Landfill Gas · Operational
1.19.4 km
Land west of Hawkspur Green (Hill Hall Solar)
Solar Photovoltaics · Operational
4.99.5 km
Rookwood Way - Solar Farm
Solar Photovoltaics · Operational
2.0412.9 km
Stanstead Solar Project
Solar Photovoltaics · Under Construction
14.313.4 km

How big is Long Meadow Solar Farm?

Long Meadow Solar Farm has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Long Meadow Solar Farm?

REPD records the operator as Low Carbon Solar Park 4 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Long Meadow Solar Farm approved and built?

The application was submitted on 2021-01-21. Permission was granted on 2023-04-21, 27 months later. The site became operational on 2025-06-01, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8824.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council